Mission Statement Obiz Profile Consultancy Domain Training Domain Professional Services Contact Us

  Obiz Pakistan (Private) Limited

                         Corporate Trainers & Consultants
                                            .......INDUCING STRENGTH

Home
Up
Obiz Clients
Calendar
Associates
Photo Gallery
Downloads

 

 

 

Obiz Pakistan The Pioneer in IWCF Courses in Pakistan

IWCF Well Control Certification Course (DRILLER/SUPERVISOR LEVEL)

This course, followed by IWCF examination, will be conducted using a portable simulator, invariably covering the contents approved by IWCF, by an IWCF accredited instructor/assessor from GTSC

The participants will be awarded IWCF certificates.

Course Duration:  Five days (four days training and one day certification test).

Course Fee: US$2,200 (US Dollar Two thousand Two hundred only) per participant.

Registration for the course may be sought by filling the registration form along with a cheque/bank draft/cash of US$2,200/- in the name of Obiz Oil Services (Pvt.) Ltd.

Full fee will be refunded, if and only if, Obiz cancels the course or changes the date for more than two weeks.

This course is designed for drillers, tool-pushers, company representatives, drilling supervisors and rig superintendents. 

Course Outline

Rotary Drilling: Well Control Overview, Basic Pressure Concepts, Bottom Hole Pressure & Leak Off Test, Causes of Kick, Kick Warning, Signs and Kick Indicators, Shut-In Procedures, Kill Sheet Preparation, Well Killing Methods, Problems During Circulating Out Kick, Blow Out Prevention Equipment, IWCF written test & Drilling and Well Control Simulator Assessment.

 

 Detailed Course Outline

DAY-1

Session - I

ü          Kick

ü          Blowout

ü          Primary well control

ü          Secondary well control

ü          Tertiary control

ü          Pressures -

·       Hydrostatic

·       Bottom hole

·       Formation

ü          Effect of hydrostatic. Pressure with different density fluids in the hole

 

Session - II

ü          Leak off test

ü          Maximum allowable annular surface pressure

ü          Kick tolerance

ü          Top hole drilling

ü          Major hazards of shallow gas influx

ü          Shallow gas control procedures

·       While drilling

·       While tripping

 

Session - III

ü          Gas Cutting

ü          Swab and surge effects

ü          Trip margin

ü          Slow circulation rate

·       When to record

·       Approximate Calculations

ü          Causes of kicks

ü          Indications

·       While tripping

·       While drilling

 

Session IV

ü          Positive kick signs

ü          Shut in procedures

·       Hard shut in

·       Soft shut in

ü          Shut in pressure interpretation

ü          Shut in drill pipe pressure

ü          Shut in casing pressure

ü          Bringing the pump to kill speed

ü          Type of influx

 

Day-2

Session - I

ü          Gas influx behavior

·       Open well migration

·       Closed-in conditions migration

·       Closed-in conditions circulating

ü          Well killing method

·       Driller's method

-        Preparation of kill sheet

-        Kill rate

-        Initial & final circulating pressures

 

-    The rig floor procedure

-        Pressure profile of surface pressure in annulus

-        Action in case of excessive pressure

-        Merits and demerits over other methods

 

Session - II

·       Wait and weight method

-        Preparation of kill sheet

-        Kill rate

-        Initial & final circulating pressure

-        The rig floor procedure

-        Pressure profile of surface pressure in annulus

-        Action in case of excessive pressure

-        Merits and demerits over other methods

-        Volumetric method

-        Lubrication or top kill

-        Stripping and snubbing operations

·       Recommended stripping guidelines

·       Stripping using annular preventor

·       Stripping using ram preventor

 

Session - III

ü          Unusual situations in well control

·       Plugged or washed bit nozzles

·       Partial plugging

·       Total plugging

ü          Washed out bit nozzles

ü          Pump failure

ü          Plugged chokes

ü          Washed chokes

ü          String washout

 

Session - IV

ü          Lost circulation

·       Partial loss

·       Total loss

ü          Control operations

·       With heavy mud

·       With barite plug

·       With gunk plug

ü          BOPs :

·       Annular

·       Ram type

·       BOP stack arrangements

·       Advantages and disadvantages of various arrangements

·       Criteria for selection of appropriate arrangement

·       Choke line manifold

·       Kill line manifold

 

(Also Practical Training on Simulator)

 

 

 

DAY-3

Session - I

ü          Special equipment

·       Inside BOP

·       FOSV

·       Bit Float

·       Fast shut off coupling

·       Drop in check valve

ü          Function testing of blow out preventors

ü          Pressure testing of blow out preventors

ü          Closing and opening ratios

 

Session - II

ü          Pressure test procedure for choke and kill manifold

ü          BOP drills

·       Why to be conducted?

·       How to be conducted?

·       Responsibility assignment to drilling crew during well control operation and BOP drill

ü          Variable ram

 

Session - III

ü          Rotating head

ü          Cup tester

ü          Test Plug 

ü          PVT

ü          Flow sensor

ü          Mud gas separator

 

Session - IV

ü          Ring joint gaskets

ü          Flanges

ü          Experience sharing on few typical well kicks converted into blowouts

ü          Interaction with the participants on few cases of well kicks / blowouts encountered by participants

(Also Practical Training on Simulator)

 

DAY-4

 

Practical Training and Test on Drilling and work over Simulator Model No. DS-20-SP. (IWFC compliant)

ü          Acclimatization on Simulator.

ü          Practical instruction on simulator

ü          Test of about 2 hour for each batch of two (1 Driller & 1 Supervisor)

 

DAY-5

Theory Papers (IWFC)

Part -I

Equipment

1 hour for Drillers

1 hour for Supervisors

 

Part -II

Principles and Procedure

1 ½ hours for Drillers

2 ½ hours for Supervisors

For further information contact: info@obizpakistan.com or obizpak@dsl.net.pk

Office: B1, Gulistan Khan House, 82 East, 'F' Block, Blue Area, Fazl-ul-Haq Road, Islamabad, (near Rahat Bakery)

Phone: (92) (51) 2275804; Fax: (92) (51) 2802440

Home