Obiz Pakistan (Pvt.) Ltd.

 Corporate Trainers & Consultants

         ……….INDUCING STRENGTH

 

Mission Statement Obiz Profile Consultancy Domain Training Domain Professional Services About Us Contact Us

 

Home
Calendar
Courses
Associates
Our Trainers
Comments
Photo_Gallery
Downloads

 

Hydrocarbon Production Operations

Instructor:        Visiting

Duration:          18 Hours

Outline of "Hydrocarbon Production Operations"

Phase Behavior of Hydrocarbons

Reservoir Pressure System

            Hydrostatic Gradient

            Bubble Point

            Dew Point

            Reservoir Energy

Production Testing

            Drill Stem Test

                        DST Assembly

                        Perforation Operation

            Wireline Tests

            Production Logging

            Extended Testing

            Communication Tests

            Cost of Testing

Production Plan

            Optimum and Uniform Production

            Minimum Expenses

            Well Stimulation

                        Fracture Job

                        Acid Job

Well Completion

            Single Completion

            Multiple Completion

Production Operation

            Wellhead Assembly

Gathering System

            Flow and Pressure Measurement

            Corrosion Control

            Pipeline Maintenance and Protection

Separation

Storage

Flowing the Well

Production Techniques

Transportation

Waste Management

Environmental Protection

Well Monitoring and Control

Telemetry

Pressure Surveys

Work-Over Job

External Energy

Production Problems

 

For further information contact: info@obizpakistan.com

Head Office: B5, Gulistan Khan House, 82 East, 'F' Block, Blue Area, Fazl-ul-Haq Road, Islamabad, (near Rahat Bakery)

Phone: (92) (51) 2275804; Fax: (92) (51) 2802440; Cell Contact: Hasan Akber, Program Manager, 0(092)3335769121